MULTI-CRITERIA DECISION MAKING SIMPLIFIED WITH AHP


In our real life we often face situations where we need to select one out of many. If the decision is dependent on single short listing criteria, the problem as well as confusion will be optimum. The problem grows many fold with increase in the number of selection criteria. AHP is a savior in such circumstances.
AHP stands for Analytic Hierarchy Process. This is one of the several Multi Criteria Decision Making techniques. I will cover them later. Credit goes to Prof. Thomas Saaty. He conceptualized AHP.
AHP ranks available list of items. It considers all the parameters for prioritizing and ranking. The best way to understand any mathematical method is to solve a problem. Going by the same rules, I will present a problem. The solution and the concept will develop simultaneously.
Problem Description:
P.1. Ranking Restaurants A, B, C and D 
P.2. Differentiating parameters: Cuisine, Price, Ambience, QoS (Quality of Service)

Solution:
Step1: Create a hierarchical structure of the problem

Step 2: Pair-wise comparison matrix
Pair-wise comparison compares one with other in the pair. A pair is compared and based on the selection the value is assigned with the help of the following comparison scale
Compare A with BValue Xij
Extreme Favors9
Very Strong Favors7
Strongly Favors5
Slightly Favors3
Equal1
If one Extremely Favors Ai over Bj then Xij will be 9 whereas Xji will be
In this case, we will have 5 pair wise matrix.
  1. Pair wise comparison of all the parameters (X1)
  2. Pair wise comparison of hotel A, B, C and D with respect to parameter Cuisine (X2)
  3. III. Pair wise comparison of hotel A, B, C and D with respect to parameter Price (X3)
  4. IV. Pair wise comparison of hotel A, B, C and D with respect to parameter Ambience (X4)
  5. Pair wise comparison of hotel A, B, C and D with respect to parameter QoS (X5)
X1= CuisinePriceAmbienceQoS
Cuisine
1
5
7
3
Price
0.2
1
3
5
Ambience
0.1428571
0.333333
0.055556
0.142857
QoS
0.3333333
0.2
7
1


X2= ABCD
A
1
3
7
9
B
0.3333333
1
3
7
C
0.1428571
0.333333
1
3
D
0.1111111
0.142857
0.333333
1
Similarly, matrix X3, X4 and X5 will be created.

Step 3: Calculating Priority Vectors from Matrix
Priority vectors are nothing but Normalized Eigen Vectors of a matrix. One can compute Eigen vectors for a given square matrix. The method employed here is not that complex. It results in an approximate solution and is good for matrix of smaller size.
  1.  Sum Each column
  2. Divide every column with column sum
  3. Compute Average of Each Row
X1= CuisinePriceAmbienceQoSPriority Vector
Cuisine
0.5966587
0.765697
0.388889
0.328228
0.519867989
Price
0.1193317
0.153139
0.166667
0.547046
0.246545929
Ambience
0.085237
0.051046
0.055556
0.01563
0.051867213
QoS
0.1988862
0.030628
0.388889
0.109409
0.181953047

X2= ABCDPriority Vector
A
0.63
0.670213
0.617647
0.45
0.591964956
B
0.21
0.223404
0.264706
0.35
0.262027534
C
0.09
0.074468
0.088235
0.15
0.100675845
D
0.07
0.031915
0.029412
0.05
0.045331665
Similarly, priority vectors are computed for matrix X3, X4 and X5.
Step 4: Consistency Check
This is done to test whether the values in matrix are consistent or not.
For example, if A is extremely favored over B and B is slightly favored over C. This implies A should either strongly or very strongly favored over C, not the other way round. This is consistency.
Inconsistency may sabotage final result.
Hence, first Principal Eigen Value is computed. Principal Eigen value is obtained from the summation of products between each element of Eigen vector and the sum of columns of the reciprocal matrix.
Step 5: Computing the final Priority
Priority vector is calculated and consistency of every matrix is evaluated. Priority vectors are tabulated as shown below.

  ABCD 
Cuisine51.986798880.5919650.2620280.1006760.045331665X2
Price24.654592940.57390.29130.0450.093X3
Ambience5.1867212730.350.450.050.15X4
QoS18.195304690.220.480.050.25X5
       
 Composite Weight50.7419531.871637.5123739.976359637 
Composite weight of Restaurant A is calculated by summing the product of column A with Priority vector (expressed in %) of matrix X1. Similarly, composite weights are calculated for other restaurants.
Hence, Restaurant A is most preferred and C is a least preferred out of 4 Restaurants.


Inventory Classification Strategies


Inventory plays a critical role in almost every business involving material and goods. Business unit strive to attain an optimum Inventory level. Higher inventory levels leads to liquidity crunch, unnecessary expenditure, storage and maintenance risk. Lower inventory levels leads to frequent stock-outs, shift in consumer loyalty, lost business opportunity.
Hence, it is necessary to maintain an optimum level of inventory at all the time. No doubt why, business gives high importance to principles of Inventory optimization and rationalization. Toyota, pioneers of Lean Manufacturing, coined a term “Just in Time (JIT)”. JIT preached and promoted concept of Minimum Inventory or Zero Inventory Level. Inventory played a pivotal role in the success of Toyota Production System, popularly known as TPS. Over years, manufacturing industry has aligned them to TPS and has reaped huge profit.
Inventory is of several types. Raw material inventory, Work-in-progress inventory, finished good inventory (FGI) etc. are Inventory types. Current location of the material demarcates Raw material inventory from WIP. Same holds true for WIP and FGI. This is one of the crude and vague methods of inventory classification. Researchers and Scholars, over the year, have defined and invented number of inventory classification techniques. Table below, summarizes some frequently used in Industry. It has two columns i.e. Nomenclature and Classification Criteria. The most popular among them is ABC classification.

NomenclatureClassification Criteria
ABCAnnual usage value (Consumption Rate * Price/Piece)
HML (High, Medium, Low)Unit Price
VED (Vital, Essential and Desirable)Criticality or loss of production
SDE (Scare, Difficult, Easy)Source of procurement
GOLF (Govt., Ordinary, Local, Foreign)Difficulty in getting clearance or permission to procure the product or material
FSN (Fast, Slow, Non-moving)Demand frequency
SOS (Seasonal and Off-Seasonal)Demand variability with time
XYZClosing stock values of the inventory at the time of physical verification
Music 3-D(Multi-Unit, Selective,Inventory, Control)The control criteria are finance, operation and material


Permutation and combination of various classification techniques, coupled with any Multi-criteria decision making algorithm will lead to a Dynamic Inventory Classification Methodology (DICM). DICM is a upcoming area of research and quite popular among academician and researchers. I, myself, am developing DICM methodology for a FMCG company. Once done, I will prepare a case study and share it on my blog page.
Thanks for reading this blog. Don’t forget to give your comment, if any.

The journey begins ... Modinagar

It was Teacher’s Day,5th September,2000,when I first landed at Modinagar Railway Station. Modinagar is a small but industrially rich city in Ghaziabad District of Uttar Pradesh, approximately 45Kms from ISBT (Inter-State Bus Terminus), Delhi. I have secured some rank in UPSEAT (Uttar Pradesh State Engineering Admission Test). It was more than enough to get a free seat in Electronics & Communication Engineering at Dr. Kedar Nath Modi Institute of Engineering and Technology, in short KNMIET. Thank God, I could not qualify JEE exams and thanks to my father who didn’t allow me to waste another year. I believe he knew my potential as a student.
So, we were at the Modinagar Railway station. I was happy as well as exited to see those Welcome posters pasted randomly on the walls around. Suddenly my father saw them and said:d
Father: Dekho tumhare college waale kitane acche hai 

Me: haan, dekhiye poster lagwaaya hai 
Father: chalo accha hai, yahaan pe sab log KNMIET ke bare me jaante honge
Me: haan sahi kahaa aapne

After walking some 100 meters, we could see some autos standing. I went to one of them and asked “
Bhaiya, K N Modi Engineering College chaloge kaya”.
“
Engineering college kidhar hai yo, degree college jaande huu mai
”, he replied.
His tone was pretty harsh and rough. I felt as if he was shouting on me. I went to a different auto and asked the same question politely, “
Bhaiyaa ji, K N Modi Engineering College aap challenge kaya
”. His voice was equally irritating and his reply even more vague.
“
Kapda Mill zayega yo….. kapda mill
”
In no time, I replied back “
nahi nahi Kapda mill nahi Engineering college ….. K N Modi Engineering College
”
Meanwhile, the whole thought of “
………..yahaan pe sab log KNMIET ke bare me zaante honge….
” was slowly evaporating out of my mind.
Later on, we came to know that Engineering College is well inside the Modi Cotton Mill.
Any how, we reached the college gate ………… no no no it was Modi Cotton Mill Gate. “Seth Rai Bahadur Multanimal Modi” was engraved ,in bold, on its wall. I remember one of my friend reading it as “Seth Rai Bahadur Multi-Animal Modi ”.


As Auto was not allowed to enter inside cotton mill, our royal journey from Railway Station to Cotton Mill finally came to an end. Gradually, I had prepared for the worst. The incident at the Railway Station had already rocked my dreamland. It was pretty dull around with no student types Hoo-hah. Without wasting any more and letting any confusion to creep in my confused brain, I asked the Security Guards, standing at the gates,"yeh K N Modi Engineering College kidar hai??"
One of them replied back softly
"Seedhe andar chale zaao,yahaan se 500 meter durr hai"We have come with full preparation and were carrying enough luggage. One of the security guards asked us to keep the luggage with him. He advised us to carry on a Rickshaw. We kept our luggage with security and started towards the destination on Rickshaw.
On our way, my father asked me, 
"Beta woh list sambhaal ke rakhi hai na".

Before leaving for Modinagar, I have listed down the name of the KNMIETians from Gorakhpur. This work started soon after I opted for KNMIET.
I answered,
"
arre aap chinta mat kijiye maine saare naam yaad kar liye hai ... waise list mere pass hai"
Anyways, our Rickshaw was moving slowly. And I was happy inside, as destination was not far away.
Suddenly, I felt a rickshaw coming from behind. I turned my head to realize
"I AM A FRESHER & IT's MY FIRST DATE IN College"

MODELLING AND SIMULATION …. ARENA WAY


ARENA is a License Tool from Rockwell Automation. My Profs. at  NITIE pursued me to learn ARENA. And, beleive me, the tool is one of the best-in-class. More importantly, we can model any real time problem or situation in it. I have been using the tool to model basic SCM and Operation activities.
ARENA helps to analyze impact of new, “what-if” business ideas, rules, and strategies before implementation. Thus, it brings down the level of risk by minimizing disruptions in services, thereby improving the KPIs.
An ARENA model has basically 3 distinguishable areas i.e. Driver, Model and Reports. It provides a good mix of statistics and reporting flexibilty. Modelling statistically varying input is very easy. It presents a very intuitive way to conceptualize an ambiguous model with real time varying scenarios.
Keep watching this section. I will share of my experience with ARENA.

Simulation - An Introduction


Though, it took me sometime to come up with my second blog on ARENA but it is worth waiting. My project priorities kept me busy and they kept me away from posting. Anyways, without wasting much of your precious time, here is my blog on simulation.
Simulation is a software model (collection of methods and application) which replicates and mimics behavior of real time processes of a system to a maximum extent. Real time risks, random glitches and failures etc are difficult to envision and hence are difficult to model. Almost, all known factors influencing the system process, directly or indirectly, form part of a simulation model.
A system can be a facility or process, either planned or actual, like
  • A warehouse handling traffic of sales and purchase orders
  • A call center
  • An hospital with OT, Patients, Ambulance etc
  • A supermarket with different SKU’s, Inventory levels, Customer volume

Most of the physical activities (involving movement of information, goods etc) form part of a system and  they can be simulated and modeled accurately.

Simulation helps one to determine the performance of a system, bottlenecks, improvement measures to be taken etc. Decisions are less risky and output is very favorable. Simulation not only provides a working model of a real time process but also lets one in uncovering unusual and unsuspected issues present which might not be present in the initial suspect list.
There are different ways to classify a simulation model.
  • Static Vs Dynamic
Time play a critical role in Dynamic Model than in Static Model. Model whose output is time-dependent are Dynamic Model and Static models are time independent.
Number of people visiting a store varies over the day (Dynamic) whereas Number of Employees in a store is constant over time (Static).
  • Continuous Vs Discrete
In continuous system, the state of the system changes continuously with time. Rising level of water in a reservoir is an example of continuous system.
The state of the system changes at specific time in a discrete system. Suppose there is a semiconductor manufacturing firm. Though, it continuously manufactures but finished product leaves the premises only in the evening or morning. Since, the outbound delivery of the finished component happens in evening, hence it can be considered as an example of Discrete system.
  • Deterministic Vs Stochastic
Deterministic and Stochastic simulation model are differentiated on the nature of inputs. Deterministic system input nature is fixed. It does not vary and their nature is deterministic. Stochastic system inputs are random. It is difficult to predict the same.
Next person to be served in a queue is known(Deterministic) but the length of the queue changes with time (Stochastic)
ARENA as a simulation tool combines the benefit of a high-level simulator as well as general purpose procedural language like Microsoft® Visual® Basic or C. It provides templates of graphical simulation modeling and analysis modules which can be amalgamated to provide enough variety of simulation models.